File: OBR/0020/22 | Phase: Licitación | Date: 31/03/2023 |
Works on the installation of an alternative pipeline for liquid bulk on the north bank of the Santander Free Trade Zone (Cantabria). | ||
The infrastructure to be built is intended to provide service for loading and unloading of bulk liquids from own tanks and / or other operators' tanks to Muelle Margen Norte, making use of the subsoil concession of use by the Port Authority of Santander (APS), given the failure in the previous installation with Expte OBR/0015/21. The outlet pipeline to the dock is an essential point for the self-financing of the CZFS. The work will be carried out in accordance with the characteristics established in the Project and the Technical Specifications (PPT). |
File: OBR/0015/21 | Phase: Fin Procedimiento | Date: 15/07/2021 |
North Bank and Warehouse 10 Piping Work | ||
The infrastructure in question is subject to the subsoil concession of use by the Port Authority of Santander (APS), granted on 14/05/2021. Given the age and condition of the facility, it is necessary to reinstall a new access pipeline through the tunnel for the movement of liquid bulk cargo to the dock on the north side. Given that it is affected by this work, it has been decided to include the planned demolition of Warehouse 10 in the same procedure. |
File: OBR/0001/21 | Phase: Fin Procedimiento | Date: 11/05/2021 |
Rehabilitation of Warehouse Nº5 located in the perimeter of ZFS (Customs Zone). | ||
Given the age and condition of Warehouse No. 5, it is necessary to refurbish the interior, including the commissioning of the forklift, as well as the exterior conservation. It is necessary to initiate the processing of this Procurement File, taking into consideration the clear insufficiency of means, which responds to the principles of necessity, suitability and efficiency, since it is necessary to provide the Warehouse indicated for the clients. |
File: OBRA/0002/20 | Phase: Fin Procedimiento | Date: 10/06/2020 |
Rehabilitation Work for the Workers' Service Space | ||
Refurbishment works of spaces for workers: changing rooms, canteen, rest area, lockers, etc. in a pre-existing building located in the perimeter of the Santander Free Trade Zone, in accordance with the characteristics established in the Project and the Technical Specifications (PPT). |
File: SUM/0015/20 | Phase: Fin Procedimiento | Date: 11/06/2020 |
Supply: Articulated All Terrain Diesel Platform Lift | ||
Supply of Articulated Diesel All Terrain Platform Lift according to the Technical Specifications (PPT). |
File: OBRA/0006/19 | Phase: Fin Procedimiento | Date: 27/12/2019 |
Obra Reparación y Reacondicionamiento Nave 3 Pol. WISSOCQ | ||
Tender for the refurbishment of Warehouse 3 WISSOCQ industrial park, once the Concession has been granted by the Port Authority of Santander, pending the Building Permit. |
File: SER/0042/19 | Phase: Fin Procedimiento | Date: 21/10/2019 |
Sistema de Accesos Peatonales y de Vehículos a las Instalaciones en Zona Franca de Santander | ||
Pedestrian and Vehicle Access System to the Facilities in the Santander Free Trade Zone, as explained in the Tender Documents. |
File: SUM/0015/19 | Phase: Fin Procedimiento | Date: 28/02/2019 |
All Terrain Self-Propelled Platform Lifts | ||
Acquisition of a self-propelled all-terrain articulated lifting platform for work at heights in the Santander Free Trade Zone. The Technical Specifications and Administrative Clauses are attached. |